Battersea Power Station Decomissioning

Background

Battersea Power Station A was built in the 1930s, with Battersea B Power Station to the east in the 1950s. The two stations were built to a nearly identical design, providing the long-recognized four-chimney layout. The station ceased generating electricity in 1983, but over the past 50 years it has become one of the best known landmarks in London.

During decommissioning a large area of hard standing was being used as a holding area for stockpiles of potentially contaminated soil, excavated from the Battersea Power Station site. During periods of heavy rain, large volumes of water runoff from he stockpiles caused local flooding of site roads and potentially silting up surface and foul drainage.

The Overall Objective

The resulting water runoff due to the heavy rain led to the requirement of a treatment system capable of dealing with up to 50m³/hr of water.

Solution

Siltbuster provided a HB50 settlement unit to help treat the water and prevent the site from flooding, whilst discharging only treated water to foul sewer under Consent to Discharge regulated by Thames Water.

LEARN MORE ABOUT SITE BORNE WATER & LEGISLATION COMPLIANCE AT GEOTEX SEMINARS

Our GEOTEX seminar programme for 2020 is now ready for registration in venues around the UK.

OUR FREE TO ATTEND
SEMINAR SERIES

DEDICATED TO GROUND ENGINEERING

GEOTEX Glasgow – APRIL 22
April
22

GEOTEX Glasgow – APRIL 22

Sir Chris Hoy Velodrome
GEOTEX Birmingham – MAY 21
May
21

GEOTEX Birmingham – MAY 21

ThinkTank, Science Museum
GEOTEX Leeds – JUNE 24
June
24

GEOTEX Leeds – JUNE 24

The Tetley Brewery
GEOTEX Portsmouth – JULY 15
July
15

GEOTEX Portsmouth – JULY 15

Fort Nelson
GEOTEX London – OCT 14
Oct
14

GEOTEX London – OCT 14

RAF Museum Hendon
GEOTEX Bristol – NOV 11
NOV
11

GEOTEX Bristol – NOV 11

Bristol Zoo Pavillion
Share This